LOOKBOOK SYSTEM

VISUAL
PROJECTS

Filed by project signal rather than by member. Each image set records a material, a light state and a District 7 condition.

AH / 002 / RELEASED AFTER HOURS_002

BACKSTAGE
AFTERBURN

After the show, before the lights go out: hard flash, service corridors and performance heat that has not yet faded.

CL / 003 / RESTRICTED COMPLIANCE LAB_003

CITRUS
PROTOCOL

The cold-white experimental grid keeps scanning. Translucent materials, citrus-yellow numbers and precise sightlines form Ning’s analysis channel.

DO / 004 / RELEASED DAY OFF_004

LOW SIGNAL
INTERVAL

Fruit-energy output drops while member dynamics keep running. Sofa, convenience-store and high-window records form a low-signal interval.

NS / 005 / CORRUPTEDNO SIGNAL_005

DISTANT
TRACE

Surveillance feeds, car windows and distant rooftops leave low-resolution records. The signal is incomplete, but the subjects remain identifiable.

BS / 006 / RELEASEDBURNING STAGE_006

STAGE
HEAT

High-temperature lighting, hard side-stage flash and three fruit-energy signals release at once. The stage frame keeps all three members visually balanced.